For brands developing new products in China

Hardware product development in China.
Run by your own department, not a referral.

Hardware product development in China runs as a sequence: DFM, prototypes, tooling, validation, a pilot run, mass production, and quality control that carries on after launch. An outsourced China manufacturing department runs that sequence for you in the factory's timezone and in Chinese, on a project fee that only applies when you are developing something.

What hardware product development in China involves

Each stage exists to catch what the stage before it missed. Most expensive problems come from treating a pass at one stage as a pass at the next.

1 · DFM, before tooling

The design is reviewed against the process that will actually make it: wall sections, draft, gate and ejector positions, tolerance stack-up, and the cost consequences of each. DFM at concept costs an hour. DFM after tooling costs a re-cut. Design for manufacturing →

2 · Prototypes, chosen by the question

A prototype is picked by what it has to prove, not by which process is quickest. Draft, walls, shrinkage, porosity and finish do not show up in a printed or machined prototype. They show up at the first production samples. Prototype manufacturing →

3 · Tooling

Steel specification, cavity count, T1 through to approval, and the ownership terms written into the order before money moves. The tool being yours on paper and the tool being movable in practice are two different things. Why three degrees of draft is the cheapest decision on a casting →

4 · EVT / DVT / PVT-style validation

EVT (10–50 units) proves the design works as intended. DVT proves it works the way customers will use it. PVT proves the factory can build it consistently at scale. Smaller programmes run the same idea as a validation batch and then a pre-production run.

5 · Pilot run

A pre-mass-production run on the production process. The validation batch catches design-intent problems; the pilot run catches process problems, before they are paid for at production volume.

6 · Mass production and QC

A pre-shipment quality gate 3 days before every shipment: AQL sampling, re-measurement of critical dimensions, packaging and shipping-mark checks, and an explicit release-or-hold call made in China, before the container closes.

How Mountain Xie's outsourced department runs it

Development work sits in the project-fee pool of the outsourced China manufacturing department: quoted per project, so you are not paying a standing fee for development capacity in the quarters you are not developing anything.

Once the product is in production, the same team carries it into the monthly work: supplier scoring, the pre-shipment quality gate, complaint traceability, price-increase defence and the tooling asset register.

Behind the reviews is the group's engineering team — 30 tool engineers, 15 project engineers, 15 CNC programmers and 6 product designers, working in UG, Pro/E, CATIA, SolidWorks, AutoCAD and Moldflow, on the same site as the machines. Parts are verified on six CMMs to ≤0.0005 mm.

The right test at the right moment is the cheapest insurance in hardware: on one production run, a $1,800 thermal-cycling test caught a snap-fit defect affecting 6,000 units that visual QC had passed. Case studies →

Why this exists

At the China office I built for Termozeta, an Italian appliance brand, from 2005, the core lines were industrial irons and capsule coffee machines — and the China team designed and developed most of them. From 2015 I began working with overseas hardware teams, and at the busiest stage was involved in or hosted no fewer than fifty projects a year. With RaceBox, from the first generation through RaceBox Mini, I took part in the full journey from concept and engineering development to shipment.

30+ years in hardware, 366 projects. About Mountain Xie →

Outsourced department vs sourcing agent vs your own China office

Most people searching for a China manufacturing consultant are choosing between these three. The difference is who each one works for and what it covers once development starts.

Outsourced manufacturing departmentSourcing agentOwn China office
Who it works forYou, on a monthly contractOften paid by commission on ordersYou (employees)
NPI, DFM and tooling developmentProject fee, only when you developLimitedNeeds engineers on staff
Pre-shipment quality gateYes, release-or-hold call before the container closesVariesYes, if staffed
Tooling asset registerYes, verified on siteRarelyYes, if someone owns it
Fixed overheadMonthly retainer; scales with your volumeLow, built into price or commissionStaff, lease, entity, equipment
Exit costContract noticeLowSeverance, lease, wind-down

Use a sourcing agent

When the job is finding a supplier for a defined part, and nobody needs to own DFM, tooling or the quality gate afterwards.

Use the outsourced department

When you already produce in China and want development, tooling and quality run for you — without the payroll, lease and entity of an office.

Keep your own office

When it is staffed with engineers and the fixed cost is justified every quarter. If it no longer is, see the China office alternative →

Questions about hardware product development in China

What does hardware product development in China involve?
Seven pieces of work, in order: DFM against the process that will make the part, prototypes chosen by the question they answer, tooling, EVT/DVT/PVT-style validation, a pilot run on the production process, the move to mass production, and quality control that carries on after launch. Each stage exists to catch what the stage before it missed.
What are EVT, DVT and PVT?
The three validation stages before mass production. EVT (10–50 units) proves the design works as intended. DVT proves it works the way customers will use it. PVT proves the factory can build it consistently at scale. Skipping a stage usually costs more than it saves.
When should DFM happen?
Before tooling is cut, not after. DFM at concept costs an hour. DFM after tooling costs a re-cut. A review that does not name the process it reviews against is not a DFM review. More on DFM.
Is a China manufacturing consultant the same as a sourcing agent?
Not here. A sourcing agent is typically paid on orders and focuses on finding suppliers. This is an outsourced manufacturing department that works for you: development work is a project fee, paid only when you develop something, and the recurring supplier, quality and cost work runs on a monthly contract.
Who owns the tooling?
You, in writing. The ownership terms are written into the order before money moves. If your contract does not say you own the mold, you do not own the mold — one founder's $47,000 mold became a $78,000 problem because nothing in writing said the factory had to release it.
Do you steer development work to your own factories?
The operating team shares no personnel with the factories and carries its own profit and loss. Clients choose their own suppliers. If you want it in the contract, the factories can be excluded from bidding unless you invite them.

Bring the product you are about to develop

Thirty minutes on what you are developing, where it will be made, and which stages above currently have nobody owning them. If it is not a fit, you will hear that on the call. Other ways to get in touch.

Book a 30-minute scoping call